Eliminate specification rejection & on-site fitting delays. 26-year manufacturer delivers certified MSS SP 58 pipe hangers and supports with full traceability, engineered for industrial & commercial piping systems.
Share:
Eliminate specification rejection & on-site fitting delays. 26-year manufacturer delivers certified MSS SP 58 pipe hangers and supports with full traceability, engineered for industrial & commercial piping systems.
✅ ISO 9001 · CE · RoHS · 30,000㎡ factory · 120+ CNC machines
🏭 26-year manufacturing · 500,000+ pcs/month
35% of engineering audits reject pipe supports due to missing MSS SP 58 material & load markings. Rework costs 3x more.
Non-modular designs cause 24% longer installation labor. LISEGA data shows adjustable supports cut delays by 24%.
Low-cost supports often fail corrosion tests, increasing replacement cycle by 40% in chemical plants.
Traceability & certification packages missing for 1 in 5 imported hangers – leads to project delays.
“The industrial fasteners market hit $96.4B in 2025, yet 30% of buyers still face compliance & supply chain friction.” — DataIntelo 2025
Full range of clevis hangers, riser clamps, U-bolts, beam clamps, and pipe saddles. MSS SP 58 pipe hangers and supports manufactured in-house with 100% dimensional inspection.
Carbon steel, stainless 304/316, hot-dip galvanized, epoxy-coated. All meet ASTM A123 / A153.
Modular designs with 24% faster installation. Rated for 200–9000 lb, with test certificates.
Heat number, coating thickness, dimensional report – digital dossier per batch.
| Product type | Material grade | Load range (lb) | Standard finish | Certification |
|---|---|---|---|---|
| Clevis hanger | ASTM A36 / A240 304 | 400 – 6,000 | HDG / epoxy | ISO 9001, CE |
| Riser clamp | Ductile iron 65-45-12 | 800 – 9,000 | Galvanized / powder | MSS SP 58, RoHS |
| U-bolt | SAE 1018 / 304 SS | 200 – 3,200 | Zinc / hot-dip | FCC, RoHS |
| Beam clamp | Forged C45 / 316 | 600 – 7,500 | HDG / PTFE | CE, ISO 9001 |
*Custom sizes, drilling, and marking available. Full dimensional report provided per order.
“Specified MSS SP 58 type 5 riser clamps for 8” schedule 40 steam lines. Full traceability pack + 3rd party load test saved 2 weeks of inspection.” — Project engineer, BASF supplier

“We switched our pipe hanger supply to Guanbiao. 37% cost reduction, zero non-conformance in 18 months.”
— Procurement Lead, US industrial contractor“MSS SP 58 certified clevis hangers delivered in 12 days. Fastener quality & coating excellent.”
— Project Manager, Netherlands EPC“OEM/U-bolt customization saved us 15% per joint. Engineering team is very responsive.”
— Technical Director, German machinery
✅ CE · RoHS · FCC · CBMSS SP 58 is the Manufacturers Standardization Society specification for pipe hangers and supports – covering material, design, load ratings, and testing. We supply MSS SP 58 pipe hangers and supports with full compliance documentation.
Yes. We offer OEM/ODM for clevis hangers, U-bolts, riser clamps – any size, carbon or stainless, with hot-dip galvanized, epoxy, or powder coating. Minimum order quantity applies.
Standard sizes: 12–18 days. Customized: 20–30 days. We have 500,000+ pcs/month capacity and can air-express urgent samples within 7 days.
Yes, we offer free samples for MSS SP 58 pipe hangers (you pay shipping). Request via WhatsApp or email.
100% dimensional inspection, material test reports (MTR), load test certificates, and coating thickness verification. ISO 9001 certified.
T/T, L/C, PayPal, Western Union. For first orders, 30% deposit + 70% balance before shipment.

Free samples · Full traceability · 26-year reliability
📧 info@topfastener.com · Jack@topfastener.com · 30,000㎡ factory in Hebei, China
⏳ Limited-time: free sample box for first 3 inquiries this month. Money-back guarantee if not satisfied.
Hit enter to search or ESC to close